What's New | Site Map | Print This Page | Contact Us
Grid Charger
Grid charger owners and location
Grid charger code V2.2 manual
Understanding the charging and balancing process
Pack discharger
SOC reset device
Insight Battery pack lifter
Grid charger test adapters
Programming adapter
Installing the Genesis One Universal grid charger in an Insight
Installing the Genesis One Universal grid charger in a First Gen Civic
MIMA Pack Whack and rebalancing the battery
Mikes Insight
EV Insight with a Prius heart
A push from Karma or another distraction ???
PCD is fixed and ready to go
Power Split Device (PSD) becomes Power Combining Device (PCD)
Rolling chassis for conversion??
Synergy arrives
The green machine
Time to get going on this project
Grid charger Operating Instructions V1.2
Designing a PHEV system for the Civics, Insight 1 and 2 ------------Micro V-Buck PHEV
Doug's V-Boost
Randall's Insight
Paul's Adventures in alternative evergy
Red Light Racing builds the worlds first Diesel Insight
Western Washington University X-Prize car
BlueBird1
Finding The Best Hybrid Mix
E-wheel for any vehicle


> Is it too late? I think not if we act now > Products and projects > EV Insight with a Prius heart > Time to get going on this project

Time to get going on this project

Time to get going on this project
IMA motor components

I ordered a 3 phase motor controller development board from Microchip, and am preparing for some Fall experimenting with driving both the Prius synergy drive, and the Honda IMA motors. I pulled out the IMA motor parts. Lots of room to improve the mechanical and cooling aspects of the motor now that I am ready to run it without the IMA engine attached.


> Is it too late? I think not if we act now > Products and projects > EV Insight with a Prius heart > Time to get going on this project
Home - Shopping Cart - New User Registration - MIMA Insight System - Products and projects - Workshops - Events - Resources - Mikes Blogs - Mikes Tips - What's New