These final connections complete the wiring to the rear harness. The two temperature probes will be placed into their proper positions once the testing part of this installation is finished. Plug all of the BCM and MCM connectors back into their proper sockets. The wire harness will have the covers reassembled once we have confirmed proper operation and correct wiring in the next steps.
|  | | | Connector refrence for the three connections |
|